REPORT TITLE |
| 1 |
|
| |
This report helps to identify wear particle trends by measuring wear particle concentration in oil. |
| 2 |
|
| |
This report shows infrared inspection results for all equipments. |
| 3 |
|
| |
This report shows infrared inspection results for all equipments. |
| 4 |
|
| |
This report shows results for machine condition and lubricant condition. |
| 5 |
|
| |
The general purpose of multiple regression is to study relationship between several predictors(independent variable)
and response variable(dependent). Here dependent variable is Maintenance Hrs of assets and predictors are Manufacturer,
Mean Time Between Failures in Hrs(MTBF),Preventive Maintenance(PM_Hrs) and Corrective Maintenance(CM_Hrs),PM frequency. |
| 6 |
|
| |
The general purpose of multiple regression is to study relationship between several predictors(independent variable)
and response variable(dependent). Here dependent variable is Maintenance Hrs of assets and predictors are Manufacturer,
Mean Time Between Failures in Hrs(MTBF),Preventive Maintenance(PM_Hrs) and Corrective Maintenance(CM_Hrs),PM frequency. |
| 7 |
|
| |
This model used to find relationship between Maintenance Cost and factors affecting on it. Using Multiple Regression model it predicts maintenance cost. |
| 8 |
|
| |
This model used to find relationship between Maintenance time (Hrs) and factors affecting on it. Using It shows the significant factors which affecting the maintenance time (Hrs). |
| 9 |
|
| |
This report shows vibration analysis results for an asset. It helps to create alert when vibration limits are exceeded. |
| 10 |
|
| |
This report shows Predictive Maintenance report by using Vibration Analysis technique for particular asset. |